Keep ISO evidence in IFS Cloud records an auditor can open
IFS Cloud supports ISO 9001, ISO 14001 and ISO 45001 through four standard functions. Document Management controls documents. The Non Conformance Report carries corrective and preventive actions. Audit Management plans audits from a compliance plan, while Health and Safety registers incidents. None of them certifies you. Each one produces a dated record with an owner and a status, which is what an auditor asks to see.
Key takeaways
- A document revision in IFS Cloud moves through five statuses from Preliminary to Obsolete, and the approved file cannot be modified. That status trail is the evidence of document control.
- A non conformance report closes only when every correction action line is Verified, and verification is done by someone other than the person who corrected it.
- Correction and corrective action are different records: the NCR correction removes the defect, a CAPA created from the NCR addresses the cause.
- Audit Management plans audits per reference standard and business area, so the three standards can sit in one compliance plan with separate audit schedules.
- Most of the work is basic data and object connections: reference standards and audit authorities, disposition codes, incident classes, plus the list of business objects that are NCR aware or audit aware.
Quality and safety teams that run ISO on spreadsheets beside the ERP keep two versions of the truth: the receipt, shop order or supplier lives in IFS Cloud, and the nonconformity about it lives in a file nobody can link back. The functions below remove that gap because the record is attached to the business object it concerns. This article covers what each function records, how the statuses run and where implementations go wrong. It names no ISO clause numbers: the requirement topics are enough to map the functions, and your certification body works from the edition you are certified to.
1.Which IFS Cloud function covers which ISO requirement?
ISO 9001, ISO 14001 and ISO 45001 are management system standards, and all three expect controlled documented information, a defined response to nonconformity and a programme of internal audits. Those three topics are where an ERP can hold the evidence, so the table starts there.
| Requirement topic | IFS Cloud function | Record the auditor sees |
|---|---|---|
| Control of documented information | Document Management: document revisions, approval routing, access control | Revision with its status history and approval steps |
| Nonconformity and corrective action | Non Conformance Report (NCR) and Corrective and Preventive Action (CAPA) | NCR with its correction lines and verification, plus a linked CAPA |
| Internal audit programme | Audit Management: compliance plan and audits | Compliance plan record per reference standard and business area, audits with findings |
| Occupational incidents (ISO 45001) | Health and Safety: incident registration | Incident with its class and location, linked to connected objects |
Quality inspection at receipt belongs to the same picture, because inspected stock that waits too long is a nonconformity in the making. The mechanics of that queue are in Stock Stuck in Quality Inspection in IFS Cloud.
2.How does IFS Cloud control documented information?
IFS Cloud Document Management controls a document through revisions and statuses: Preliminary, Approval in Progress, Approved, Released and Obsolete, as listed on the Create and Maintain Document page of the 25R2 documentation. The same page describes approval routing templates connected to a document revision, and access control that keeps new documentation unavailable until it reaches the required quality level.
What the approval step guarantees
Final approval of a revision is possible only from Preliminary or Approval in Progress, and in the second case all routing steps must be approved first. After approval, the Approve Document Revision page states that modifications may not be made to the approved document file. A change therefore means a new revision with its own approval, which is the behaviour an auditor tests when asking how an outdated work instruction is kept off the shop floor.
Connect the document to the object it governs
IFS Cloud has a service for connecting documents to business objects across the application. A work instruction connected to the object it describes is found from that object, and the document shows every object it is connected to. A procedure stored only in a folder structure gives the auditor nothing to follow from the transaction back to the rule.
The implementation decision that matters most here is the document class design and the routing template per class. A policy and a form usually need different approvers, and a single routing for every class either slows down forms or under-controls policies. Decide this before migrating documents, because each migrated revision lands in a class and a status.
3.How does a nonconformity run from NCR to CAPA in IFS Cloud?
An NCR in IFS Cloud can be raised directly from a quality audit or from any business object, according to the 25R2 page Non Conformance Report (NCR). A business object offers this only after a system administrator has configured it as NCR aware on the Object Connections page, so the list of objects that can carry an NCR is a setup decision, not a default.
The ISO 9001 Auditing Practices Group guidance on reviewing and closing nonconformities quotes the ISO 9000 definitions: a correction eliminates a detected nonconformity, and a corrective action eliminates its cause to prevent recurrence. The NCR and the CAPA in IFS Cloud follow the same split.
- Release and disposition. With the NCR header in Released status, the disposition step records a disposition code, a disposition responsible, a disposition note and a correction responsible. The header moves to In Progress and the correction action lines to Dispositioned (Manage NCR Disposition). Disposition codes are basic data and must exist first.
- Correction. The correction responsible carries out the correction and the lines reach Corrected.
- Verification. A third party confirms that the correction is completed and the result is satisfying. Each line moves to Verified, and when all lines are Verified the NCR header changes to Closed (Manage NCR Verification).
- Corrective or preventive action. A CAPA is created from the NCR header or from its Corrections section, from an NCR-aware business object, or as a standalone record, and it starts in Created status (Create Corrective and Preventive Action).
The pitfall I look for first in an existing setup is an NCR closed on correction alone. The defect is gone, the header says Closed, and the cause is still there. Whether every NCR needs a CAPA is your rule to write; what matters is that the rule exists and the NCR shows which way it went. The APG guidance itself says correction or corrective action can be sufficient on its own in some cases, so the decision has to be visible, not implied.
Lot and serial data make the NCR useful beyond one receipt, because the affected stock can be traced. Gaps in that data are covered in Lot-Tracked Parts With No Lot Number in IFS Cloud.
4.How do you plan internal audits for three standards in one place?
Audit Management in IFS Cloud plans audits through compliance plan records, and each record must define a target year, company, business area, reference standard and reference (Create Compliance Plan Records). At least one business area and one reference standard must exist in basic data before the first record can be created.
That structure is what lets one plan carry several standards. Define each ISO standard as a separate reference standard, define your business areas, and the compliance plan shows per year which area is audited against which standard. A record for ISO 45001 in the warehouse and a record for ISO 9001 in purchasing are two lines of the same plan with their own audits.
An audit can be created from a compliance plan item on the Compliance Planning page with the New Audit assistant, from the Audit page, or from a business object that is configured as audit aware. The new audit starts in Planned status, and at least one audit authority must be defined in basic data first (Create Audit). Findings that need action become NCRs raised from the audit, so the chain from audit to correction to verification stays in one system.
External auditors usually need to read these records without touching commercial data. That is a permission set design question, covered in Designing Audit-Ready Permission Sets in IFS Cloud.
5.Where do ISO 45001 incidents and ISO 14001 records go?
IFS Cloud Health and Safety registers an incident that caused injury or illness to personnel or damage to property, using New Incident (Register Incident Information). Before the first registration, incident classes, organization codes in the graphical organization structure, and locations with sub-locations must be defined. The Connected To field links the incident to related objects, again limited to the objects configured in Object Connections.
The setup order matters for ISO 45001 reporting. Incident classes and the location structure decide how incidents can be counted and compared later, so they should be agreed with the safety manager before go-live and not reshaped after the first year of data.
For ISO 14001, the functions above carry the evidence without a separate tool: permits and the register of legal obligations as controlled documents with a named owner, environmental nonconformities as NCRs on the affected object, and ISO 14001 as its own reference standard in the compliance plan. I do not describe IFS Cloud as tracking regulatory changes for you. Keeping the register current is a task for a named person, and each update becomes a new document revision with its own approval.
6.In what order should you set this up?
Compliance functions in IFS Cloud depend on basic data that is easy to skip during a project, and an empty basic data table blocks the first transaction. This is the order I use.
| Step | What to define | What it blocks if missing |
|---|---|---|
| 1. Object Connections | Which business objects are NCR aware and audit aware, and which can connect documents and incidents | Creating NCRs, CAPAs or audits from those objects |
| 2. Audit basic data | Reference standards, business areas, audit authorities | Compliance plan records and audits |
| 3. NCR basic data | Disposition codes and the people who disposition and verify | The disposition step |
| 4. Document classes | A class per document type, such as policy or permit, with a routing template per class | Controlled approval of migrated documents |
| 5. Health and Safety basic data | Incident classes and organization codes; locations with sub-locations | Incident registration |
Each row is a decision with an owner, and it belongs in the implementation documentation like any other design decision. If you are still in the project, the Implementation Documentation Kit has templates for recording these decisions. If you plan to extend the standard flows, keep the extension update-safe as described in Update-Safe IFS Cloud Extensions.
7.Frequently asked questions
Does IFS Cloud make a company ISO 9001 certified?
No. IFS Cloud does not certify a company to ISO 9001; certification comes from an external certification body auditing the management system. IFS Cloud holds the evidence that audit looks at: controlled document revisions, verified non conformance reports with their corrective actions, and internal audit records.
Do we need a separate QMS tool next to IFS Cloud?
IFS Cloud includes document control, non conformance reports with CAPA, and audit management as standard functions. A separate quality tool is worth its cost only for a requirement these functions do not meet, and the price of that tool is a nonconformity record that is not connected to the receipt, part or supplier it concerns.
When is a non conformance report closed in IFS Cloud?
An IFS Cloud non conformance report changes to Closed when all its correction action lines are in Verified status. Verification is a separate step in which a third party confirms that the correction is completed and the result is satisfying, so the person who corrected the problem does not close the report alone.
Can one IFS Cloud compliance plan cover ISO 9001, ISO 14001 and ISO 45001?
Yes. Each compliance plan record in IFS Cloud Audit Management names a reference standard and a business area, so each of the three standards can be defined as a separate reference standard and planned in one compliance plan, each with its own audits per business area and target year.
Can an IFS Cloud user change an approved procedure document?
No. In IFS Cloud Document Management, modifications may not be made to an approved document file. A change to an approved procedure is made in a new document revision, which goes through its own approval before it replaces the previous one.
8.About the author
Dariusz Myśliwiec: 18 years hands-on with IFS (Apps 7.5 to 10 and IFS Cloud). IFS Certified Associate Consultant. PRINCE2® 7. Independent practice based in Kraków, delivered remotely across Europe and globally. You talk to the consultant who does the work, not a sales layer.
Selected clients from my IFS work: Fugro · LGC · BVI Medical · Betafence (PRÆSIDIAD) · Barlinek · NGK Ceramics · Newag · Oleofarm.
IFS is a registered trademark of IFS AB; this practice is not affiliated with IFS AB.
Moving ISO records into IFS Cloud?
Bring your list of controlled document types, your NCR process and your audit programme. On a technical call we go through the basic data and object connections they need in IFS Cloud and the order to set them up.

Deutsch (Deutschland)
Polski (PL)