Skip to main contentSkip to footer

A line goes down at 6am, and the plant does the thing it always does. Someone finds Marek, because Marek has been here twenty years and Marek knows the machine. He remembers it did this last winter. He thinks the spare is on a shelf in the back, unless it is the one they used in March. Nobody can say when it was last serviced, because that lives in his head and a laminated sheet by the panel. The line is losing money by the minute while the whole recovery runs on one man’s memory.

Here is the strange part. This plant runs IFS Cloud. It plans beautifully, promises orders to the day, closes its books cleanly. And the one system that could have told them when the asset was last touched and whether the spare was in stock has been sitting in the licence the whole time, switched off.

“

They chose IFS partly because it unifies ERP, asset management and field service in one model. Then they ran the ERP and left the asset management dark.

It is one of the commonest patterns we see, and one of the priciest. So this is not a feature tour. It is a straight answer to why the dark module is usually the highest-return thing left in the building, and what changes the day you switch it on.

Four questions your plant asks every day

Strip away the acronyms (EAM, MRO, preventive, predictive) and the maintenance side of IFS Cloud simply answers four questions Marek is answering from memory right now.

🏭

What do we own?

A real asset register (sites, locations, equipment and the parts inside them), so a machine is a living record with a history, not a line in a fixed-asset spreadsheet.

📅

How do we keep it running?

Preventive work orders that raise themselves on a schedule, a meter or a condition, instead of waiting for a 6am failure to remind you the machine exists.

🔨

What do we do when it breaks?

A corrective work order that gathers the labour, the parts, the instructions and the history in one place, and pulls the spare from the same inventory your ERP already runs.

📈

Is it actually worth keeping?

Cost, downtime and reliability captured over an asset’s life, so your worst offenders for cost and breakdown are a report, not an argument in a corridor.

The quiet magic is in the third answer. Because it is all one model, the spare Marek is hunting for is the same part your MRP plans, your buyers purchase and your finance values. No interface. No reconciliation. No second version of the truth.

The biggest return is the part left switched off

Your ERP go-live tidied things you could already see: orders, stock, invoices. Maintenance is different, and more valuable, precisely because today it is invisible. And invisible is where the money hides.

⏱

Downtime

The priciest hour in any plant, and the one maintenance exists to prevent. Move even a slice of failures from reactive to planned and it goes straight to the bottom line. Money you currently cannot even measure.

📦

Spare parts

Working capital nobody is steering. On a spreadsheet, stores over-stock “just in case” while the one critical spare is always missing. On one platform with MRP, the guesswork becomes a plan.

🧠

Knowledge

Right now it is Marek. When Marek retires, a plant on memory loses him. A plant on IFS keeps every work order, fault and part recorded against the machine.

None of this needs a new system bought, evaluated or implemented. It needs the module already in your licence configured and turned on.

And the same record reaches the technician in the van

If you also service equipment in the field, IFS extends the very same model into Field Service Management: scheduling, dispatch, mobile work, parts in the van, the customer-facing side of it all. What matters is that it is not a separate tool with its own database bolted on the side. The asset, its history and its spare parts are the same records the plant and the ERP already use. The technician on a customer site sees what the planner sees. That single-model continuity, with plant, field, inventory and finance on one platform, is exactly what a standalone maintenance app can never give you, and it is precisely what you already bought.

Switching it on is a project of weeks, not a re-implementation

The trick is sequencing it sanely rather than trying to boil the ocean. Start by building the asset register only as deep as you will actually maintain: model to the level you will raise a work order against, no finer, because a register you can keep up beats a perfect one you cannot. Put your first preventive plans on the assets that hurt worst when they stop, ranked by what a failure costs in downtime and safety. Connect spares to the inventory you already run, so “where is the spare” becomes a reservation instead of a scramble. Then let the data steer the rest: once work orders carry real cost and failure history, the machines that deserve condition-based or predictive attention raise their own hands. You stop guessing where to spend maintenance effort and start following the evidence.

🔑

You almost certainly own more IFS Cloud than you run

The maintenance and asset-management capability is the part manufacturer after manufacturer leaves dark, and it sits directly on top of the highest, least-visible costs in the whole operation: downtime, spare-parts capital, and the knowledge that walks out with the people who hold it.

6am, the other version

Run the same morning again with the module on. The line stops. This time the work order is already open on a screen, with the machine’s full history under it: last serviced six weeks ago, this fault seen twice before, the fix that worked. The spare shows two in stock, aisle and bin. A technician is assigned before anyone has finished their coffee. Marek is still the best engineer in the building, but now the plant no longer depends on his memory to get the line back, and neither will the person who takes his job.

The software was there the whole time. The only decision left is to switch on the lights.

Switch on the module you’re already paying for

We help manufacturers already on IFS Cloud light up maintenance and asset management, with no second platform and no re-implementation. If your assets live on a whiteboard beside a world-class ERP, that is the gap we close.

Switch on your asset management

ROI Calculator

Calculate your return on investment

Input Values

€
€
€

Results

Annual Savings
€ 0
Payback Period
0 months
ROI
0%
Monthly Savings
€ 0

Get Detailed Report

Enter your details to receive a detailed ROI report.