API
IFS Cloud exposes its data and business logic through APIs built on projections, which are available as OData and REST endpoints. Aurena itself uses the same projections, so an integration that calls them goes through the same business rules and security as a user working on screen. This tag collects articles about how to design and secure such integrations.
Principles that hold across integrations
Use the documented API instead of reading the database directly. Direct access bypasses validation and security, and it is exposed to change at every release. A projection is a supported contract, and its metadata describes entities, keys and available actions, so the first step is always to read that metadata.
What to settle before writing the first call
- Authentication. IFS Cloud uses OAuth2, so decide which client and which flow the external system uses.
- Identity and rights. Give each integration its own account and limit its Permission Sets to the projections it needs.
- Read or write. Start with reading. Writing requires thought about duplicates, retries and what a failure leaves behind.
- Volume. Use filters and paging so that a scheduled job does not request more data than necessary.
- Monitoring. A failed call should be visible to someone who can act on it.
The articles also show a practical example, connecting an automation tool through OAuth2 and OData. For a project team the useful output is a short integration specification: the system, the projection, the account, the permission, the frequency and the owner. An integration without a named owner is the one that fails quietly after a release.
-
API Integration in IFS Cloud: A Practical Overview
-
How to connect n8n to IFS Cloud with OAuth2 and OData
-
IFS Cloud API Integration: OData und OAuth 2.0 einrichten
-
Integracja API w IFS Cloud: praktyczny przegląd
-
Jak połączyć n8n z IFS Cloud: OAuth2 i OData krok po kroku
-
Przygotowanie do go-live i testy IFS Cloud: progi i role
