Skip to main contentSkip to footer

Template IDK-11, version 1.0. Phase: Establish Solution.

How to use this template

  • Use one specification per integration or modification in the CRIM log (template IDK-10). Configurations and reports use template IDK-12 instead.
  • Do not start this document until the CRIM log shows the decision "Approved for specification". Do not start development until sections 13 and 14 are signed.
  • Write sections 1 to 4 in business language so the process owner can approve them. Sections 5 to 9 may be technical.
  • Section 11 is not optional. An integration or modification without a stated update impact will surprise someone at the first release update.
  • Keep this document current after go-live. Support receives the latest version at handover, together with the test scenarios in section 10.
  • Replace every [...] field. Delete the rows marked Example: before approval.
Template metadata
Field Value
Template ID IDK-11
Phase Establish Solution
Owner Application consultant, with the technical solution manager
Approver Customer process owner and customer project manager, commercial approval by both project managers, steering group authorisation
Qualification gate Solution Established
Version 1.0

Document control

Field Value
Project [Project name]
CRIM log ID [ID]
Type [Integration / Modification]
Interface register ID (integrations) [ID]
Solution area and process [Area, process, link to process model]
Author [Name, role]
Technical designer [Name]
Status [Draft / In review / Approved / Revised]
Storage location [Link]
Version Date Author Change Approved by
0.1 [YYYY-MM-DD] [Name] First draft  
[x.y] [YYYY-MM-DD] [Name] [Change] [Name]

1. Business need

State the need, not the solution. Name who has the need and what happens to the business if it is not met.

Item Description
Need Example: Buyers must see supplier order confirmations in IFS Cloud without keying them in, so that late or changed dates are visible on the day the supplier reports them
Who has the need Example: Buyers at all sites, purchasing manager
Consequence if not met Example: Confirmed dates stay in e-mail, planning runs on wanted dates, late deliveries are found at the dock
Book of Rules reference [Document, decision ID]
Benefit the sponsor expects [Text, link to business case item if any]

2. Process context

Item Description
Process and step affected [Process, step in the process model]
Roles affected [Business roles]
Sites and companies in scope [List]
Upstream dependency [What must have happened before]
Downstream effect [What uses the result]
Other CRIM objects related [IDs]

3. Current standard behaviour

Describe what standard IFS Cloud does today for this step. Verify it in the project environment before writing. Do not describe it from memory or from a previous version.

Item Description
Standard functionality reviewed Example: Manual entry of confirmed date and quantity on the purchase order line. Standard inbound message handling for order confirmations through IFS Connect.
Environment and version where it was verified [Environment name, release and service update level]
Shown to [Names, date]
Why standard is not sufficient Example: The supplier portal cannot produce the standard message format, and manual entry does not scale with the number of lines
Standard alternatives rejected, with reason [Alternative, reason]

4. Required behaviour

Number each requirement. Each one must be testable and must map to at least one scenario in section 10.

Req ID Requirement Priority Source
Example: R1 When the supplier portal reports a confirmation, the matching purchase order line shows the confirmed delivery date and quantity Must Book of Rules PUR-D07
Example: R2 A confirmation that does not match an open line is not applied. It is listed for the buyer with the reason. Must Workshop [YYYY-MM-DD]
[ID] [Requirement] [Must / Should / Could] [Source]

Out of scope for this specification: [list explicitly].

5. Functional design

5.1 Overview

[Short narrative of the solution, with a flow diagram or link. State where each part runs: inside IFS Cloud, in middleware, in the other system.]

5.2 Design steps

Step Actor or component Action Result
Example: 1 Supplier portal Publishes a confirmation with order number, line, release, date and quantity Message available to the integration layer
Example: 2 Integration layer Looks up the purchase order line through the projection, checks status and open quantity Line found, or error per section 8
Example: 3 Integration layer Calls the standard action that confirms the line Standard business logic validates and updates the line
[n] [Actor] [Action] [Result]

5.3 User-visible changes

Page or lobby Change Roles that see it
[Page] [Change, or "none"] [Roles]

5.4 Design principles applied

  • Updates go through standard projections and their business logic. No direct database writes.
  • Prefer configuration and published interfaces over changed application code. State the tailoring level from the CRIM log: [Interface extension / Modification].
  • [Project-specific principle]

6. Data and projections used

Confirm projection, entity set and action names in the API Explorer of the project environment. Names below are placeholders until verified.

Projection Entity set or action Operation Fields read or written Verified in environment, date
Example: [Purchase order handling projection] [Purchase order line entity set] Read Order number, line, release, status, wanted date, open quantity [Environment], [YYYY-MM-DD]
Example: [Purchase order handling projection] [Confirm line action] Write Confirmed date, confirmed quantity [Environment], [YYYY-MM-DD]
[Projection] [Entity set / action] [Read / Write] [Fields] [Verified]

Field mapping:

Source field Target field Transformation or rule Mandatory
[Field] [Field] [Rule] [Yes / No]

Custom fields, custom entities or configuration needed by this design: [list with CRIM IDs, or "none"].

7. Security

Item Description
Integration account [Account name. One account per integration, never a named person.]
Authentication method [For example OAuth client credentials through the IFS identity provider]
Permission set [Name. Grants only the projections and actions in section 6.]
Read-only or write [Read-only / Write. Write access needs the steering group authorisation recorded in section 13.]
Credentials custodian [Role that stores and rotates the secret]
Rotation and revocation [How the secret is rotated, how access is removed at decommissioning]
Personal or sensitive data carried [None / description, with the privacy owner's approval reference]
Network path [Source, target, ports, encryption in transit]
Logging [What is logged, where, retention, confirmation that logs hold keys only and no business content if required]

8. Error handling

Error ID Situation Detection System response Who is notified and how Recovery
Example: E1 Order line not found or already closed Lookup returns no open line Message parked with reason, nothing updated Buyer, through [lobby element / e-mail event] Buyer corrects reference in the portal, message is reprocessed
Example: E2 IFS Cloud not reachable Call fails or times out Retry [agree in project] times, then park Integration owner, through monitoring alert Automatic reprocessing when the connection returns
[ID] [Situation] [Detection] [Response] [Notification] [Recovery]

Rules: no message is lost silently, no message is applied twice, and every parked message has an owner.

9. Volumes and performance

Fill in with figures from the business. Do not estimate them in the project team.

Measure Value Source of the figure
Transactions per day, normal [agree in project] [Name, role]
Transactions per day, peak [agree in project] [Name, role]
Largest single message or file [agree in project] [Name, role]
Required processing time [agree in project] [Name, role]
Operating window [agree in project] [Name, role]
Growth expected [agree in project] [Name, role]

Volume test required before SAT: [Yes / No, reference to test plan].

10. Test scenarios

Cover the common flow first, then normal exceptions, then specific exceptions. These scenarios become the test specification handed to support.

Test ID Covers Class Preconditions and data Steps Expected result Result, tester, date
Example: T1 R1 Common Released purchase order with one open line Publish a confirmation for the full quantity with a date later than wanted Line shows confirmed date and quantity. Order history shows the change. No error parked. [Pass / Fail], [Name], [YYYY-MM-DD]
Example: T2 R2, E1 Normal exception Purchase order line already closed Publish a confirmation for that line Nothing updated. Message parked with reason. Buyer sees it in [place].  
[ID] [Req IDs] [Common / Normal exception / Specific exception] [Data] [Steps] [Expected]  

Test environments: unit test in [environment], integration test in [environment], included in SAT script [ID]. Tests run with the real integration account and permission set, not with an administrator account.

11. Update impact

Item Description
Tailoring level [Interface extension / Modification, from the CRIM log]
Delivered objects touched [Projections, entities, pages, code modules]
What must be re-verified at each release update Example: Names and signatures of the entity sets and actions in section 6, behaviour of the confirm action, permission set grants, scenarios T1 and T2
What must be checked at each service update [Usually a smoke test of scenario T1, state it]
Rebuild or uplift needed at release update [No for Interface extension / Yes for Modification, with estimated effort [agree in project]]
Owner of re-verification [Customer role after go-live]
Exit condition [Under what circumstances this object can be retired, for example when standard covers the need]

12. Deployment and handover

Item Description
Delivery route [Build Place to Use Place environments for code, configuration packages for configuration, deployment of external components]
Cutover steps needed [Entries to add to the cutover plan]
Monitoring after go-live [What is monitored, by whom]
Support owner [Role]
Handover content This specification, the test scenarios in section 10, the interface register row, credentials custodian details

13. Estimate and commercial approval

Development does not start before this section is complete.

Item Value
Estimate for specification, build, test, documentation [agree in project]
Estimate for recurring update effort [agree in project]
Assumptions and exclusions [Text]
Change request reference [ID]
Steering group authorisation [Meeting date, minute reference]
Role Name Decision Date Signature
Supplier project manager [Name] [Approved / Rejected] [YYYY-MM-DD]  
Customer project manager [Name]      
Customer sponsor (if required by the contract) [Name]      

14. Approval

By approving, the customer confirms that sections 1 to 4 describe the need and the required behaviour correctly, that the test scenarios in section 10 are the basis for acceptance, and that the update impact in section 11 is understood.

Role Name Decision Date Signature
Customer process owner [Name] [Approved / Approved with comments / Rejected] [YYYY-MM-DD]  
Customer project manager [Name]      
Technical solution manager (technical design reviewed) [Name]      
Solution architect (coherence reviewed) [Name]      

Comments and conditions: [text]

Independent template aligned with the IFS implementation methodology. Not an official IFS document. IFS is a registered trademark of IFS AB.

Independent template aligned with the IFS implementation methodology. Not an official IFS document. IFS is a registered trademark of IFS AB.

ROI Calculator

Calculate your return on investment

Input Values

€
€
€

Results

Annual Savings
€ 0
Payback Period
0 months
ROI
0%
Monthly Savings
€ 0

Get Detailed Report

Enter your details to receive a detailed ROI report.