Quick Report
Quick Reports in IFS Cloud let a business user or consultant define a report on top of the data already in the system and run it from Aurena, usually with export to Excel. They are the fastest route from a question such as how late are our deliveries to a table that someone can open, filter and share, without a formal report development project.
What the examples under this tag show
The articles tagged Quick Report use two concrete cases. One is an On-Time In-Full report, which compares what was promised to the customer with what was delivered and in which quantity. The other is a stock aging view, which shows how long inventory has been sitting. Both start as plain business questions, and both depend on choosing the right source data and the right date.
Practical rules for building a Quick Report
- Define the question first. A report with an unclear definition of late or aged will produce numbers nobody trusts.
- Use the right date. Promised date, planned date and wanted date mean different things, and the choice changes the result.
- Control access. Who may run the report and who may edit it should be set through Permission Sets, because a report can expose data a user would not see on a normal page.
- Watch performance. A query that scans large tables should be tested on production-sized data before users depend on it.
- Document it. Record the author, the purpose and the definitions, so the report survives a change of staff.
A Quick Report is not a replacement for a data warehouse. It answers operational questions well and strategic ones poorly. Use this tag to find ready-to-adapt examples and the reasoning behind each design choice.
-
Konfigurationsspezifikation Vorlage IFS Cloud (IDK-12)
-
Lagerbestand Altersanalyse IFS Cloud: Quick Report
-
Materialverbrauch Fertigungsauftrag IFS Cloud: Quick Report
-
On-Time In-Full (OTIF) Report for IFS Cloud
-
OTIF-Bericht für IFS Cloud: Lieferverzug früh erkennen
-
Raport On-Time In-Full (OTIF)
-
Raport wieku zapasów IFS Cloud: Quick Report SQL
-
Smart Stock Aging Report: Quick Report for IFS Cloud
